Project Details:
Work performed: Replacement of the damaged vaporizer with a high-efficiency 300 kg/hr unit, 1 unit,
with installation of a new control panel.
System Modification and Integration:
- Key components: Replacement of damaged core equipment with new, highly stable technology.
- Installation: Piping modification and reconnection
and complete replacement of control system wiring
(Electrical & Control Wiring), integrated with the existing system to restore full, safe operation.
Standards & Safety Compliance:
- Testing: Functional testing and operational checks to confirm compliance with engineering standards.
- Operational readiness: Thorough leak and electrical checks before handover to restore continuous, reliable, and safe operation.