Project Details:
Gas supply station: Installation of a high-efficiency bulk storage gas supply system designed for heavy-duty operation
(Heavy-Duty), specifically serving 1 boiler.
Vaporizer installation: A high-efficiency 400 kg/hr vaporizer, 1 unit, supplies sufficient gas
for full-capacity boiler operation without gas supply limitations,
even during peak loads.
Standards and safety:
- Installation and system testing performed by specialist engineers.
- Designed and installed to Department of Energy Business standards.
- Comprehensive fire protection in accordance with safety requirements.
This project focuses on a powerful gas supply system dedicated to boilers. Adequate reserve capacity and precise gas vaporization ensure smooth, safe, uninterrupted production (Zero Downtime), in accordance with international engineering standards.