Replacement of LPG VAPORIZER 300 KG & CONTRAIL PANEL

( Critical Replacement & Upgrade )

Installation location: Agricultural industry facility, Nakhon Nayok.

“Restoring Reliability: replacing damaged equipment for superior performance”

Project Details:

Work performed: Replacement of the damaged vaporizer with a high-efficiency 300 kg/hr unit, 1 unit,
with installation of a new control panel.

System Modification and Integration:

  • Key components: Replacement of damaged core equipment with new, highly stable technology.
  • Installation: Piping modification and reconnection
    and complete replacement of control system wiring
    (Electrical & Control Wiring), integrated with the existing system to restore full, safe operation.

Standards & Safety Compliance:

  • Testing: Functional testing and operational checks to confirm compliance with engineering standards.
  • Operational readiness: Thorough leak and electrical checks before handover to restore continuous, reliable, and safe operation.