Project Details:
Gas supply station: Installation of 3.5-ton LPG storage tanks, 4 units (total reserve capacity 14 tons), positioned in accordance with advanced safety engineering principles (Safety Distancing) to support continuous operation even during peak loads.
Vaporizer installation: High-efficiency 300 kg/hr vaporizers, 2 units (total 600 kg/hr), providing sufficient gas for continuous, seamless operation of a 6-ton boiler.
Standards and safety:
- Gas detection and automatic gas shut-off systems.
- Installation and system testing performed by specialist engineers.
- Designed and installed to Department of Energy Business standards.
- Comprehensive fire protection in accordance with safety requirements.
Every stage undergoes high-pressure performance testing by specialist engineers.
To ensure maximum system strength and safety before commissioning.