Project Details:
Gas supply system: Installation of a manifold cylinder gas supply system.
Vaporizer: Capacity of 300 kg/hr, providing sufficient and consistent vaporization for
1.5-ton boilers, 2 units.
System Modification and Integration:
- Gas detection and automatic gas shut-off systems.
- Installation and system testing performed by specialist engineers.
- Designed and installed to Department of Energy Business standards.
- Comprehensive fire protection in accordance with safety requirements.
- Installation of pressure switches to detect pressure levels and low gas supply, with alerts sent
in real time to the control room, helping prevent production interruptions with precision.
This project is a model for modern gas supply systems in food manufacturing, emphasizing “production continuity”
and “advanced safety standards”, integrating early gas alerts for highly efficient energy management.